Seeing the recent Forbes Article on The (Unlucky) 13 Traits of High Maintenance People it made me think. What are the traits of a high maintenance manufacturing organization or facilities?
So let’s look at 10 of the 13 categories from the article but in the context of manufacturing and reliability.
1 -They have urgent “needs.” To a high maintenance sites, everything is urgent. All the repairs and upgrades to their assets are done without proper planning or the lead time to properly source parts economically. They don’t use predictive technology to identify equipment problems in advance.
The 5 second solution: Set criteria for work that makes it clear what is an emergency repair and what should be planned and scheduled for the future. Emergent repairs can cost as much as 5 times as much to execute. Use predictive maintenance technologies like vibration analysis, ultrasound, etc. to help identify failures before they happen and proactively plan the repair. There is a great post here on some of the benefits of predictive maintenance.
2 – They have a sense of entitlement. Everyone deserves to be treated with equal respect. The high maintenance facility will expect more. They request more work in process inventory allocation, larger maintenance budgets, more staff and higher capital allotments.
The 5 second solution : Create benchmarks metrics that accurately represent the organizations or facilities and allow them to take a journey of self-discovery. This will enable them to challenge their own levels of entitlement, especially as they try to explain their variances.
3 – They could be self-sufficient. But they’re not. They constantly look to corporate for support and funds to improve the site and they blame their situation on the fact that they are not receiving the support they "need".
The 5 second solution: Build a plan to self-fund your improvement process. Many sites are able to start their improvements early in the fiscal year and generate the financial returns to offset the expenses prior to year end. The well thought out plan is the key to this success.
4 – They cling to stories of facility wrongs from the past. The high maintenance sites have a difficult time moving past real or imagined corporate wrongs. These may include corporate enforced reduction in force efforts, budget cuts, or failed past corporate initiatives.
The 5 second solution: As a leader, you do individuals locked into the “blame game” a favor by not playing into the negativity dialogue. “I’m sorry that happened. But you’re here now, things are different, and we have work to do.”
5 – They talk. Continuously. The high maintenance site thrives on attention. They have a continual need for others to hear what they have done. While discussion best practice sharing and brainstorming is necessary and healthy, these sites prefer to talk about what they have done not what they are going to do. They are not necessarily interested in improving; only showing what they have improved.
The 5 second solution: Finish every discussion and presentation with a challenge. "What are you going to do better and different to improve within the next year?"
6 – They are seldom satisfied. High maintenance sites will find the flaws in every situation. Even when they’ve been given extra care and attention, they will invariably find something wrong with the solution or service they’ve received. For example when they receive an opportunity to produce a new product they will only focus on how hard it will be with their existing equipment and resort to an additional capital request.
The 5 second solution: Make it clear that everyone understands nothing is perfect but that the site has the knowledge and skills to solve the problem and if and only if they can’t solve it should they return to corporate for additional support.
7 – They are high-strung. Not all high-strung organizations are high maintenance. But the organization with excessive needs will be persistently vocal and anxious about the things they require. They are the squeaky wheel in search of grease.
The 5 second solution: Again – it’s a dependency you shouldn’t encourage or feed.
8 – They live in a state of perpetual drama. If you are around a high maintenance site for an time at all, you will observe frequent periods chaos and turmoil. Every small inconvenience or mistake becomes a crisis.
The 5 Second solution: Take the time to list the common items that create their drama. Help them to create proactive plans for how each of these failures or issues is going to be dealt with.
9 – They handle money poorly. Regardless of the economy or circumstance, high maintenance sites continue to spend recklessly on inventory and parts. They use overtime like it is free. They don't think of the business cases behind the decisions they make.
The 5 second solution: Instill business case thinking using A3 documents or some other tool and ensure that they think from a life cycle costing perspective.
10 – They resent authority are often critical of other sites. It is extremely difficult for these individuals to respect corporate authority or to see the bigger picture. They focus only on their site and do not go out of their way to work to benefit the company as a whole.
The 5 second solution: Generally, in a case like this, there is direct intervention required. Remind the site that the business is like the body and one highly effective arm on body that is in a coma is useless.
By now you may be detecting a pattern of traits. Responsibility lies with the organization to create and reinforce a positive culture. Do you have a working environment that allows bad behaviors to take hold and fester? Do you actively feed and reward the positive behaviors? Do you set a good example yourself?
Showing posts with label Benchmarking. Show all posts
Showing posts with label Benchmarking. Show all posts
Tuesday, January 7, 2014
Wednesday, September 4, 2013
Benchmarking and Internal Assesments: Eight Questions That Will Improve Your Studies and Their Results
If you saw last weeks post on the troubles "benchmarkers" deal with here then you may be wondering how do we make it better? If you are addressing the issues mentioned there and you want to take it to the next level here are eight points to consider when assessing your performance and benchmarking with others. These are based on the seventy plus assessments I have been involved in during the last ten years and the struggles I have seen during those and other assessments.
Does your assessment or benchmarking study have the following:
an element of Volume – Does the assessment have more than just yes or no questions? Does it look into the amount of application of the concept or element or just the existence? For example, does it ask "Do you have planners?" or "What percentage of work is fully planned?" or as a second example "Do you use work orders?" or "What percentage of your craft hours is captured on a work order?" The second question in each provides the element of volume. This demonstrates the penetration of the concept into the way the site does business not just whether they have pockets of excellence in one area.
Detail - Do you have enough data and detail in each of the sections or elements of the assessment? Do you get a complete picture of the components that make up the element being assessed? For example: Can you address all of the elements of Planning and Scheduling effectiveness with just one question in your study? Not likely. You will need more details and data in order to identify actionable gaps for closure.
Frequency – Are you doing it often enough? If you are only assessing or benchmarking once every ten years that would show little trend data. I would recommend a robust external assessment every three to four years for maximum effect. External does not have to be a consultant driven process you just need fresh eyes from another site or division.
Process Standard – Do you have a process and standards for the benchmark assessment so that the data is of like kind and comparable with other locations?
Personnel Standard – Do your assessors have the knowledge and competency to assess? Are they task qualified in the process standard. Are they standardized? Will the non-task qualified assessors affect the comparability of the data where they are involved? I have seen this over and over. Having a standard for performance and qualifying individuals is crucial to effective benchmarking.
Performance – Is the assessment having the desired effect? Is the assessment providing a view into the gaps that you need to address? Is the study executed at a level that identifies next steps to close the gaps. Is it driving the organization to close those gap? Is the organization better as a whole because they did the study?
Efficiency – Are you doing the study efficiently? Is it a major disruption to the business or can it be accomplished with minimal interruptions. Is your assessment or benchmark study addressing the elements required without being exhaustive? Is it full of manual calculations or does it standardized on base data that is used to generate the various calculations "automagicly"?
Innovation – Are you finding a better way to do it? Have you improved the assessment and benchmarking process each time you have executed it? This could be through data standardization or tool improvements or collected history.
This become the checklist that I review to ensure the highest level of success with benchmarking and assessments. Every time I use this list I am upping the return on effort of the study.
Are you happy with your assessments and benchmarking studies? Tell us about what you like with yours below in the comments section please.
Does your assessment or benchmarking study have the following:
an element of Volume – Does the assessment have more than just yes or no questions? Does it look into the amount of application of the concept or element or just the existence? For example, does it ask "Do you have planners?" or "What percentage of work is fully planned?" or as a second example "Do you use work orders?" or "What percentage of your craft hours is captured on a work order?" The second question in each provides the element of volume. This demonstrates the penetration of the concept into the way the site does business not just whether they have pockets of excellence in one area.
Detail - Do you have enough data and detail in each of the sections or elements of the assessment? Do you get a complete picture of the components that make up the element being assessed? For example: Can you address all of the elements of Planning and Scheduling effectiveness with just one question in your study? Not likely. You will need more details and data in order to identify actionable gaps for closure.
Frequency – Are you doing it often enough? If you are only assessing or benchmarking once every ten years that would show little trend data. I would recommend a robust external assessment every three to four years for maximum effect. External does not have to be a consultant driven process you just need fresh eyes from another site or division.
Process Standard – Do you have a process and standards for the benchmark assessment so that the data is of like kind and comparable with other locations?
Personnel Standard – Do your assessors have the knowledge and competency to assess? Are they task qualified in the process standard. Are they standardized? Will the non-task qualified assessors affect the comparability of the data where they are involved? I have seen this over and over. Having a standard for performance and qualifying individuals is crucial to effective benchmarking.
Performance – Is the assessment having the desired effect? Is the assessment providing a view into the gaps that you need to address? Is the study executed at a level that identifies next steps to close the gaps. Is it driving the organization to close those gap? Is the organization better as a whole because they did the study?
Efficiency – Are you doing the study efficiently? Is it a major disruption to the business or can it be accomplished with minimal interruptions. Is your assessment or benchmark study addressing the elements required without being exhaustive? Is it full of manual calculations or does it standardized on base data that is used to generate the various calculations "automagicly"?
Innovation – Are you finding a better way to do it? Have you improved the assessment and benchmarking process each time you have executed it? This could be through data standardization or tool improvements or collected history.
This become the checklist that I review to ensure the highest level of success with benchmarking and assessments. Every time I use this list I am upping the return on effort of the study.
Are you happy with your assessments and benchmarking studies? Tell us about what you like with yours below in the comments section please.
Tuesday, August 27, 2013
Five Reasons Your Benchmarking Survey Might Suck
That's right your benchmarking efforts might not be worth the time it takes to populate the survey. I know it hurts to hear it but it is all too common. You may even be shocked but, I see surveys all the time where the data and comparisons are nearly useless except to draw the most basic of conclusions. Below are five reasons they miss the mark and next week I will share five areas your surveys should focus on to be most effective.
- Companies and organizations exchange numbers with no context for the data and the result sucks. Are the sites even truly comparable? I do not believe that we are all different in fact there is a blog on that subject here but I do think that certain key differences are important enough to note and communicate in the survey. For instance, you would not compare the Overall Equipment Effectiveness or OEE from a continuous process chemical plant with a batch process specialty paint plant. They are both in the chemical arena but they would have significantly different OEE numbers. So comparing by industry alone is not always a good idea without more information.
- Companies and organizations exchange numbers with no standards for calculation and the results suck. If you try to compare two metrics that are calculated using different data or a different equation you can not draw meaningful conclusions. Sticking with the OEE example, if you have one site that includes preventive maintenance down time and another that does not then their is no comparison in the metric. If you are an SMRP member you can gain access to their metric standards for calculation of many of the common metrics and improve your comparisons validity.
- Benchmarking studies that do not look at processes and practices just metrics might suck. While metrics are important we have to look at processes and practices. If all we do is compare numbers without looking at the systems and processes that generate those numbers then I believe it is very hard to identify the best practices that can get you to a new level of performance. Many times you can learn more by walking around and talking to staff than could ever be gained from a metrics survey. All I am saying here is you need to do both.
- Benchmarking sample comparison is not representative of the best practices that exist so sites have a false sense of security and that sucks. Many organization only want to look at surveys and practices from their industry or niche. Over the years I have seen a couple of industries in particular that love to do this. The problem is while they were comparing themselves against their "peers" other industries have passed them by elevating the best practices. They are now left to be the best in a sorry lot. Study other organizations and other vertical's metrics and practices to see how you compare with the best in the world not just the best in your vertical.
- Metrics in the study are not targeted to the problems or situations you face at your site therefor they provide little actionable information and you guessed it... it can sucks. Sometimes the benchmarking survey leads people to believe that those metrics in the survey are all they should focus on when in reality the metrics that they really should be focused on are entirely different. The metrics you focus on are the ones that drive the behavioral change that you need. If you change the behaviors then the other metrics will improve on their own. For instance, if you are having trouble getting failure history for FRACAS and that is the behavior you are trying to change then that is what you should measure and focus on but you will be hard pressed to find work order failure code completion percentages on a benchmarking study.
Wednesday, April 24, 2013
Best Practice Metrics Performance Requires Best Practices...
Over the years I have worked with many sites all over the world specifically to help them with assessments of their "As is" state. These were in preparation for their reliability, safety, and operations improvement initiative that will help them attain their "to be" state and the performance gain that is associated with that improvement.
The assessment process has many different variations depending on the site and the topic but all of them should have three things in common. The three are:
My point is that if the three areas of focus do not match you may want to use some root cause analysis tools to find the underlying causes. Once these are found then you can explain the disconnect between the three areas. The second step is to help the site see the mismatch in metrics, practices, application and culture. I like to use our maturity matrices which you can get here to help with this element. The site has to understand that world class performance on metrics has to be supported by world class performance in business process, culture, and application. Once they are comfortable with this then they can begin to embrace the true "as is" and discover the true potential that they can capture in the gap.
Have you experience the mis-match?
The assessment process has many different variations depending on the site and the topic but all of them should have three things in common. The three are:
- a metrics or key performance indicator review
- practices and documentation review
- interaction with as many of the affected and involved individuals as possible to understand application, culture, and norms
My point is that if the three areas of focus do not match you may want to use some root cause analysis tools to find the underlying causes. Once these are found then you can explain the disconnect between the three areas. The second step is to help the site see the mismatch in metrics, practices, application and culture. I like to use our maturity matrices which you can get here to help with this element. The site has to understand that world class performance on metrics has to be supported by world class performance in business process, culture, and application. Once they are comfortable with this then they can begin to embrace the true "as is" and discover the true potential that they can capture in the gap.
Have you experience the mis-match?
Sunday, January 22, 2012
10 Points to Ponder That Can Improve Your Key Performance Indicators Immediately
Here are 10 Points to Ponder That Can Improve Your Key Performance Indicators (KPI) Immediately:
1. Spend time planning for KPI implementation
Decide who needs to know about the metric or indicator and what they need to know. Who is affected and who can affect the KPI. Communicate the intent of the metric in a way that can be easily understood.
2. Think about unintentional consequences
Understand what your metric drives. Does it require a second metric to ensure that it does not drive a bad behavior? If you would like to read more about this topic check out this rant.
3. Limit your focus to ten indicators or metrics or less at each level of the organization.
Even if you track many indicators in your EAM/CMMS the focus needs to be on a short list. It is OK to have a list of focus KPIs and monitor KPIs. Focus on your key performance indicators and ensure organizational understanding. Monitor your results with the common indicators. Here is a link to more information on this topic.
4. Manage behaviors measure results.
You must identify the behaviors that you want to change and address them directly with that portion of the organization. Ensure that your indicators align directly to those organizational changes.
5. Cascade indicators down from corporate goals.
If your primary indicators do not align and support the corporate objective then you will have organizational confusion. The process works best if indicators are developed from the top down.
6. Leading verses lagging indicators
You don't drive your car using just your rear view mirror. Use indicators that tell you more than just what you have done. They should help you understand what you can expect in the future.
7. Use your metrics to ensure the truth.
Many of the indicators have corresponding indicators that work in a checks and balance fashion. This allows you to use one indicator and then if there is a question about the validity of the number you can check with the other indicators.
8. Have metrics that both operations and maintenance share accountability for.
Consider not building or reinforce organizational silos. Try to select indicators that both operations and maintenance and others affect and share them as part of their performance reviews.
9. Understand the components that make up the metric.
Many organizational struggles are over both metrics definitions and the data that is used to calculate them. Create or use an existing KPI standard and document the data sources.You can find the SMRP Metric Compendium here.
10. KPI’s are not forever
Change the metrics you focus on as your business goals change or as you notice that the change in behavior that you are measuring has been completed and has become the new way the organizations works. Here is another entry on this topic.
Two Bonus Thoughts:
Balanced score cards can help in understanding your organization.
Do not compare what is not the same. Indicators cannot be bench marked well with other facilities if they are not calculated the same way.
I hope that this list helps you think about the metrics and indicators that you are using and drives the results that your facilities want. If you have any additional questions please feel free to contact me at shon@reliabilitynow.net
1. Spend time planning for KPI implementation
Decide who needs to know about the metric or indicator and what they need to know. Who is affected and who can affect the KPI. Communicate the intent of the metric in a way that can be easily understood.
2. Think about unintentional consequences
Understand what your metric drives. Does it require a second metric to ensure that it does not drive a bad behavior? If you would like to read more about this topic check out this rant.
3. Limit your focus to ten indicators or metrics or less at each level of the organization.
Even if you track many indicators in your EAM/CMMS the focus needs to be on a short list. It is OK to have a list of focus KPIs and monitor KPIs. Focus on your key performance indicators and ensure organizational understanding. Monitor your results with the common indicators. Here is a link to more information on this topic.
4. Manage behaviors measure results.
You must identify the behaviors that you want to change and address them directly with that portion of the organization. Ensure that your indicators align directly to those organizational changes.
5. Cascade indicators down from corporate goals.
If your primary indicators do not align and support the corporate objective then you will have organizational confusion. The process works best if indicators are developed from the top down.
6. Leading verses lagging indicators
You don't drive your car using just your rear view mirror. Use indicators that tell you more than just what you have done. They should help you understand what you can expect in the future.
7. Use your metrics to ensure the truth.
Many of the indicators have corresponding indicators that work in a checks and balance fashion. This allows you to use one indicator and then if there is a question about the validity of the number you can check with the other indicators.
8. Have metrics that both operations and maintenance share accountability for.
Consider not building or reinforce organizational silos. Try to select indicators that both operations and maintenance and others affect and share them as part of their performance reviews.
9. Understand the components that make up the metric.
Many organizational struggles are over both metrics definitions and the data that is used to calculate them. Create or use an existing KPI standard and document the data sources.You can find the SMRP Metric Compendium here.
10. KPI’s are not forever
Change the metrics you focus on as your business goals change or as you notice that the change in behavior that you are measuring has been completed and has become the new way the organizations works. Here is another entry on this topic.
Two Bonus Thoughts:
Balanced score cards can help in understanding your organization.
Do not compare what is not the same. Indicators cannot be bench marked well with other facilities if they are not calculated the same way.
I hope that this list helps you think about the metrics and indicators that you are using and drives the results that your facilities want. If you have any additional questions please feel free to contact me at shon@reliabilitynow.net
Tuesday, December 27, 2011
Top 5 Maintenance and Reliability Acronyms for 2011
As the year comes to a close you begin to see a lot of list. These list cover the top X "somethings" of 2011. They are beginning to show up on the TV, the radio, and the web. In fact, on the way in to the office I heard part of the top 40 pop songs of 2011. With all of these list flying around I could not help but think about the top topics for maintenance and reliability in 2011. I have looked back over conference proceedings, discussion group post, website and blog traffic and have put together a top five acronyms list with a bit of commentary on each.
5. PdM
Predictive Maintenance is one of the maintenance and reliability tools that sites are using more and more in the place of their time based preventive task. This year, as the cost of the technology continue decreasing, more folks are adopting the technologies and wanting to talk about them. I think the key point with PdM is that your work execution process has to be strong or these technologies will just identify a lot more work that you can not get through your planning and scheduling system to execution before it runs to failure.
4. CMMS/EAM
Computerized Maintenance Management Systems/ Enterprise Asset Management Systems continue to be a big discussion point for many folks as they struggle to get the value and return on investment from these systems. Many folks continue to see the CMMS as the solution instead of the tool that enables good processes to be successful.
3. RCA
Root Cause Analysis has been very popular on this blog this year but I must admit it could be because of my focus on it as a great tool to eliminate reoccurring failures and process losses. I think the one point I would share is this: RCA doesn't have to be complicated but it requires a great deal of follow to get good results.
2. BPR
Business Process Re-engineering is a topic we see and hear most discussed around EAM implementations and LEAN projects. This tool and the process that are associated with it can remove a substantial amount of waste from your work flow. The key element for success is not that different from RCA it requires tremendous follow up and a regiment that includes the change management methodologies and our number one topic for 2011... KPIs.
1. KPI
Key Performance Indicators or metrics as they are sometimes called have been an intense area of focus this year. They generate lots of interest as sites try to figure out where they are and how they compare to others. The one suggestion I would provide for this topic is the following: Don't compare what you dont understand. Take the time to note how the metrics are calculated and how your methodology differs from others you may be comparing with. Too often I see dissimilar metrics compared and poor discisions made based on the conclusions. If you can standardise on metrics using documents like the SMRP Metrics Compendium that is avalible through SMRP.org then you can remove some of the frustration around metrics and KPIs.
I would also be remiss if I did not mention one topic that does not have an acronym yet but was a major topic of interest in 2011. That topic was the skills crisis or the departure of the baby boomer generation from the work force. Many of the acronyms above are crutial to capturing this departing knowledge and allowing for its use in the future. The key is to start now.
Reliability Now!
Thank you to all of you who have followed this blog this year and I wish you a Happy New Year
5. PdM
Predictive Maintenance is one of the maintenance and reliability tools that sites are using more and more in the place of their time based preventive task. This year, as the cost of the technology continue decreasing, more folks are adopting the technologies and wanting to talk about them. I think the key point with PdM is that your work execution process has to be strong or these technologies will just identify a lot more work that you can not get through your planning and scheduling system to execution before it runs to failure.
4. CMMS/EAM
Computerized Maintenance Management Systems/ Enterprise Asset Management Systems continue to be a big discussion point for many folks as they struggle to get the value and return on investment from these systems. Many folks continue to see the CMMS as the solution instead of the tool that enables good processes to be successful.
3. RCA
Root Cause Analysis has been very popular on this blog this year but I must admit it could be because of my focus on it as a great tool to eliminate reoccurring failures and process losses. I think the one point I would share is this: RCA doesn't have to be complicated but it requires a great deal of follow to get good results.
2. BPR
Business Process Re-engineering is a topic we see and hear most discussed around EAM implementations and LEAN projects. This tool and the process that are associated with it can remove a substantial amount of waste from your work flow. The key element for success is not that different from RCA it requires tremendous follow up and a regiment that includes the change management methodologies and our number one topic for 2011... KPIs.
1. KPI
Key Performance Indicators or metrics as they are sometimes called have been an intense area of focus this year. They generate lots of interest as sites try to figure out where they are and how they compare to others. The one suggestion I would provide for this topic is the following: Don't compare what you dont understand. Take the time to note how the metrics are calculated and how your methodology differs from others you may be comparing with. Too often I see dissimilar metrics compared and poor discisions made based on the conclusions. If you can standardise on metrics using documents like the SMRP Metrics Compendium that is avalible through SMRP.org then you can remove some of the frustration around metrics and KPIs.
I would also be remiss if I did not mention one topic that does not have an acronym yet but was a major topic of interest in 2011. That topic was the skills crisis or the departure of the baby boomer generation from the work force. Many of the acronyms above are crutial to capturing this departing knowledge and allowing for its use in the future. The key is to start now.
Reliability Now!
Thank you to all of you who have followed this blog this year and I wish you a Happy New Year
Wednesday, December 14, 2011
Don’t Start Up In a Bad Way: Five Ways to Limit the Creation of a Reactive Culture in New Facility Startup.
New facilities by nature can be reactive. Reactive behavior when it comes to reliability and maintenance is expensive. Our goal should be to be proactive in identifying risk and mitigating or eliminating it before we have to react. When you bring a new plant online there are many things that can drive the culture to be reactive. I have listed a few below:
- Poor start up planning and procedures
- The presence of excessive amounts of infant mortality type failure modes
- Equipment delivery delays
- Stocking of incorrect spare parts
- EPC contractor ineffectiveness
- EPC contract language that does not insure correct function of the assets
- No existing culture in the new facility while there is an influx of new employees from different cultures including other highly reactive companies.
With all of these reasons as well as others, it is no wonder that green field sites find themselves working to overcome a reactive culture, low production rates, and high cost. In order to limit the creation of this situation I have listed five way to turn the tide in favor of a proactive culture.
- Start early creating the business processes which will help to create the new culture. When you on board new associates being able to show them how work will be done and train them in the use of proactive tools is critical. This will allow them to change their existing paradigms where required and give you a head start on the culture that is required for maximum return on investment.
- Build the business processes based off of the best facilities in the world not just the best facilities in your division or company. Reach out with your early hire team and benchmark with an eye on being the best in the world within the constraints of your facilities business case.
- Create failure mode based maintenance strategies using the equipment vendors, EPC, associates as they are brought onboard, the operating context specific to your facility, and tools like RAM, RCM, and FMEA. If this step is done correctly then it will reduce spare parts stocking levels, equipment failures, and poor procedures which will increase early production and profitability.
- Budget for new associates to visit sister plants if they exist. The goal here is to ensure that they can have open dialogue with others who live with the assets on a daily basis. They should be looking to get hands on training, learn common problems, identify changes that have been made since start-up of the assets as well as other tidbits that will facilitate their site producing record tonnage the first year.
- Fully populate your EAM or CMMS from the start with all of the assets, spare parts, drawings, and failure codes as provided by the vendors per your contractual request.
I hope these five items offer some help on new plant or new asset start up and if you would like to learn more about the elements of a good start up then reach out to me via email and I will provide you with a look at our R5 launch methodology for new facilities.
Monday, November 28, 2011
Looking to the Outside for a Better Mousetrap
Many manufactures and for that matter companies in general have a hard time identifying with others good practices or using better technologies that was not "created here." Don't get me wrong from a change management, implementation, and adoption stand point things that are created or discovered from within can get great marks and a good return on investment. The problem is when your organization is so dead set on internal creation that you miss better technologies or lower cost solutions that could deliver the same results. For example, if you are developing a production down time tracking system, you could have your local Microsoft Access wiz build an application to collect the data and report out the metrics or key performance indicators (KPIs) but after you implement that system who will maintain it, update it, and who will support it when it does not work quite right with new equipment. This is an example of where a readily available tool that could be bought right off the shelf at a lower total life cycle cost, but if you never look outside you would not know it is there. Another example is centered around benchmarking. I see so many, who participate in benchmarking, limit themselves to just "their industry." They either do not have any idea what other industries are doing or think it is just "too different." I see this blight in certain industry segments where sites talk about how good they are compared to sister plants. Unfortunately, when you take a deeper look you realize they may be better than the sister plants but they are still underrated when compared to world class facilities from other verticals or my father says " they are the best of a sorry lot." Don't limit your performance by locking yourself in an artificial box. Look outside and use what works where it makes since and remember just because it is different does not mean it will not work for you.
Monday, December 13, 2010
What Can We Learn From Santa’s Very Reliable Workshop? Part 1
First let’s take a look at the facts:
Santa’s workshop has never missed a shipment and delivers all its product in one night. Santa’s delivery vehicle has never had a break down and his workshop has never seen an outage that jeopardized that delivery.
Santa’s workshop has 100% quality record…
Santa’s customer base is constantly growing with the population (1 billion in 1804 and 7 billion in 2011). Assuming that 30 percent of the population is under 14 years of age and each child receives on average 3 gifts then Santa’s staff is producing approximately 6.3 million complex toys per year with simple machines and manual labor.

Santa’s workforce is aging and in some cases is quite old.
Access to new equipment is limited as it has to be built in house due to his lock-tight non-disclosure agreement
Santa’s workforce is extremely limited due to remote location and elf breeding patterns.
Weather is always an issue in the Arctic.
Now that you have the situation and you have compared it to your own, Next we will look at what he has done to insure success. Click here to jump to the next entry.
Santa’s workshop has never missed a shipment and delivers all its product in one night. Santa’s delivery vehicle has never had a break down and his workshop has never seen an outage that jeopardized that delivery.
Santa’s workshop has 100% quality record…
Santa’s customer base is constantly growing with the population (1 billion in 1804 and 7 billion in 2011). Assuming that 30 percent of the population is under 14 years of age and each child receives on average 3 gifts then Santa’s staff is producing approximately 6.3 million complex toys per year with simple machines and manual labor.
Santa’s workforce is aging and in some cases is quite old.
Access to new equipment is limited as it has to be built in house due to his lock-tight non-disclosure agreement
Santa’s workforce is extremely limited due to remote location and elf breeding patterns.
Weather is always an issue in the Arctic.
Now that you have the situation and you have compared it to your own, Next we will look at what he has done to insure success. Click here to jump to the next entry.