Three Ways To Stop The Power Point Madness and Increase Retention!

Last week I had the unfortunate experience of setting through a 300 PowerPoint slide training session that was delivered in 90 minutes. People it was painful, overwhelming, and frustrating. We have got to put a stop to the "Death by PowerPoint" mentality of training. It is born out of the needs of the instructor more than the needs of the student. Shouldn't it be the other way around?  "Instructors" or more often then not SME (Subject Matter Experts) either want show the students everything they know about the topic or want to make it easier to present by having "it all in the slides." It completely overwhelms the learner and retention of the content plummets. It is like drinking water from a fire hose. You see all the content but you certainly don't quench your thirst. Below are three simple tools we use to reduce slide count and increase the interaction and retention when we teach.
1. Can you build an activity that allows the students to go on a journey of discovery?
If we can give them a simulation that creates a discovery of the learning points then the retention of the material increases and the slide count is reduced. 
2. Could you provide them with the learning points and have them design the lesson and teach the class?
Having them self study the material really increases understand if you are there to help them as a coach and then having them teach it back locks it in. We always say you don't know the content until after you have taught someone else. Its true your prep and their questions really move the learning to a deeper level.
3. Are you pausing the slides to let the student apply what they have learned? The application  of the new knowledge to their world will answer a lot of questions about the relevance and provide them with examples they can take back. As part of the pre-work, ask them to bring data or problems to solve in class. They can use these to apply the new skills.
In the end it is not about the amount of content you cover it is about the amount of material they remember, apply, and benefit from.
Happy learning!


Monday, February 29, 2016

Reliability Confessions of the Not Quite Best Practice

You have secrets. Secrets that have robbed the reliability from your facility and its assets. Sometimes it just makes you feel better if you confess your secrets publicly. Maybe you should let a few of your secrets go today, and bask in the relief that follows. Today, you have that chance using the anonymous post feature in the comments section below.  But first let me share a few secrets I know already:
1. "I use what ever grease is in the nearest grease gun I find. (grease is grease)"
2. "I sometimes overload the machine and cause it to fail because when it does I can take a break while maintenance fixes it."
3. "I never torque the bolts with a torque wrench. (Tight is tight, right?)"
4. "I once wrapped a fuse in aluminum foil because it would not stop blowing."
5. "I never put all the bolts back if the equipment doesn't need them. (I'm eliminating wasted time)"
6. "I don't wipe off the grease fitting before I lubricate."
7."I sometimes don't share all the critical steps for a job plan so that I can save the day when it does not work."
8. "I have put a 20 amp fuse in a 10 amp slot."
9. "One time I dropped a bolt into a gearbox during a PM and it is still there today."
10. "I added flammable hydraulic fluid to a system requiring nonflammable to save a trip back to the store room."
At least some of these little secrets happen regularly in plants everywhere. I challenge you to reread the list and this time think about what underlying systemic causes might have led for the perceived need for the individual to take these steps and then make them their secrets. Remember what Edward Deming said: "Blame the system not the people." Fixing the system eliminates many more problems within your site than blaming an individual. 
Don't forget to add a few secrets of your own at the bottom.

Tuesday, February 16, 2016

Preconceived Notions Get in Your Way with RCA


Preconceived notions very commonly get in your way with Root Cause Analysis. Here is a perfect example. In this picture you can plainly see that the people on the left are taller right? Look again... Maybe we did not have all of the facts at first. It seems that in the video there is more going on than we thought. Our notions of what a room is and how it is typically shaped do not hold true in this case. This irregularity, led us to a poor understanding of the situation. Many times we go after issues with our personal opinion of the problem and the solution predetermined and it blinds us to the truth of the matter. All the data must support the conclusion not just the parts that you like. I have seen these preconceived notions derail investigations time after time and, it is one of the reasons that I suggest not using subject matter experts as RCA facilitators in this blog. Check out this post for 5 ways to help prevent jumping to conclusions. Then let us know what thoughts and ideas you have for avoiding this common problem by listing them in the comments section below.

Monday, January 18, 2016

Stop Corrective Maintenance Repairs on Preventive Maintenance Work Orders.

Today's guest post by Blended Learning student Rick Clonan of Nissan is a sample of a communication to his organization to explain a problem that they had been facing. Interestingly enough it is a problem that many of us face in our sites. Thanks to Rick's willingness to share, you might be able to craft a similar example and share with your organization. 

There has been a lot of discussion as to why we are asking technicians to write corrective work orders for problems found on a PM instead of fixing the issue on the spot.  If we consider the example of the four machines below, it becomes clear why this is the case. 

        A technician is assigned a 2 hour PM for each of the machines below.  As he checks #1, there are no issues found and the PM is completed with no corrective work order generated.   As the inspection of #2 begins, he notices an issue.  This issue is not very critical and could wait until next  weekend.  He decides to fix it anyway.  The repair takes another 2 hours.  He moves on to machine #3.  There are no issues that demand immediate attention.  Since the PM of #2 and the corrective work order to fix the issue have taken a total of 4 hours, it is now time to go home, and the PM for  machine #4 does not get done. 

         The problem is, machine #4 has a failure in it that will shut the machine down in a day if not detected.  The next shift coming in has it’s own list of things to do and will not get to the PM on machine #4 that the previous shift did not complete.


    What we are trying to accomplish is to get as many failures detected as early on in the failure curve as possible.  It is understood that some repairs need to happen as soon as the fault is detected.   Most of the time this is not the case.  With the chance to plan for a repair, all of the parts can be ordered and the job will take less time.  We need to adapt to more of an inspection mindset when doing a PM and provide a clearly written corrective work order when a failure is detected.   This is not the way things have been done in the past.  We cannot continue to do things the same way and expect better results.  We must change the way we operate in order to improve. 




Great example! We hope this helps you with a topic to share or can be a model for a similar communication to your group as you chase after reliability.